Marine Power Management System (PMS) & Generator Synchronization Service
Generator synchronisation and load sharing faults
Include the generator controller models, a single-line diagram if available, and the alarm log. Note whether the fault occurs when synchronising to the bus, closing the breaker, or sharing load after connection.
Seanav Marine provides certified Power Management System (PMS) inspection, troubleshooting, and generator automatic synchronizing system servicing across all Indian ports. We attend DEIF (PPM-3, AGC), Woodward (Easygen), Schneider, Hyundai, and Terasaki panels to calibrate active/reactive load sharing, frequency control, load-dependent start/stop sequences, and blackout prevention interlocks.
Supported OEM Equipment & Multi-Make Coverage
DEIF (PPM-3 / Delomatic / AGC), Woodward (Easygen / SPM-D), Schneider Electric, Hyundai Heavy Industries, ABB, Terasaki
Technical Specifications & Operational Coverage
| Scope | Automatic Synchronizing, Active (kW) & Reactive (kVAR) Load Sharing, Frequency & Voltage Control, Non-Essential Trip Calibration, Blackout Prevention |
|---|---|
| Generator Systems | Diesel Generator Sets, Shaft Alternators, Emergency Generators, Shore-Power Interfacing Panels |
| Supported OEMs | DEIF (PPM-3 / Delomatic / AGC), Woodward (Easygen / SPM-D), Schneider Electric, Hyundai Heavy Industries, ABB, Terasaki |
| Class Approvals | IRS, DNV, ABS, ClassNK, Bureau Veritas, Lloyd's Register |
| Attendance | 24/7 at all Indian commercial gateway ports and offshore anchorages |
Standard 5-Step Generator PMS & Sync Calibration SOP
Our Class-approved technicians execute this standardized procedural workflow to ensure first-time compliance with attending Class surveyors and Indian Port State Control (PSC) inspectors:
-
Voltage & Frequency Transducer Calibration
Calibrate precision voltage and frequency transducers against certified digital multimeter standards.
-
Automatic Synchronizer & Breaker Close Timing Verification
Adjust phase angle window and lead-time compensation on electronic synchronizers to ensure zero-chatter breaker closure.
-
Active (kW) & Reactive (kVAR) Load Sharing Tuning
Adjust speed droop governor settings and AVR cross-current compensation to achieve balanced proportional load sharing between engines.
-
Non-Essential Tripping (NET) & Heavy Consumer Interlock Test
Verify automatic shedding of non-essential circuits (air conditioning, galley) upon generator overload, protecting propulsion power.
-
Live Blackout Recovery & Standby Auto-Start Simulation
Trip main bus to verify emergency generator instant start and automatic standby generator connection within 45 seconds.
24/7 Port & Anchorage Attendance Across India
Seanav Marine provides rapid shore-based and offshore launch boat boarding across all 170+ Major and Minor Indian Ports, including:
Certified Equipment & Replacement Spares in Stock
Seanav Marine maintains bonded warehouse spare parts inventory across major Indian ports for immediate dispatch and installation during port calls:
Download Marine Electrical PMS & Generator Safety Checklist
Audit load sharing, reverse power protection, and preferential tripping before major vetting inspections.