Deck Foam, High-Pressure Water Mist & Dry Chemical Powder (DCP) Survey & Supply India
Seanav Marine delivers turnkey fixed foam fire-fighting system supply, installation, annual inspection, laboratory foam analysis, overhaul, and repair for Tanker Deck Foam, Machinery Space Water Mist, and Gas Carrier Dry Chemical Powder (DCP) systems at all Indian ports. We inspect foam proportioners, inductors, foam monitors, nitrogen pilot blow-down lines, fire main system pipelines, and deluge valves in full compliance with IMO MSC.1/Circ.1312 standards.
Supported OEM Equipment & Multi-Make Coverage
Send the equipment make and model so we can confirm the scope and parts availability.
Technical Specifications & Operational Coverage
| Systems Covered | Low/High Expansion Deck Foam, Hyper-Mist Engine Room Local Application, Gas Carrier Dry Chemical Powder (DCP), Fire Main Pipelines & Hydrant Systems |
|---|---|
| Standard | SOLAS Chapter II-2 Reg 10.4, IMO MSC.1/Circ.1312, MSC.1/Circ.1432, FSS Code Chapter 6, 7 & 14 |
| Lab Analysis | Kinematic viscosity, expansion ratio, drainage time, 25% drainage test per IMO standards, pH and density certification |
| Pressure & Discharge | Proportioner mixing ratio verification, deck foam monitor swivel joint overhaul, nitrogen blow-down, deluge valve operation, fire main hydrostatic testing |
Standard 5-Step Marine Foam & DCP Fire System Protocol
Our Class-approved technicians execute this standardized procedural workflow to ensure first-time compliance with attending Class surveyors and Indian Port State Control (PSC) inspectors:
-
Foam Concentrate Sampling for Laboratory Quality Analysis
Draw representative bottom and top samples from storage tank; submit to accredited lab for sedimentation and expansion testing.
-
Proportioner & Inductor Ratio Verification
Test automatic inline foam proportioning unit with water flow to verify accurate 3% or 6% mixing ratio delivery.
-
Deck Foam Monitor, Isolation Valve & Fire Main Pressure Test
Inspect stainless steel deck monitors, swivel joints, sectional isolation valves, and fire main piping for free movement and pressure hold.
-
Gas Carrier DCP Nitrogen Propellant Cylinder Pressure Check
Verify hydrostatic dates and pressures of high-pressure nitrogen propellant cylinders powering dry chemical powder units.
-
Local Application Water Mist Nozzle & Optical Flame Sensor Test
Inspect high-pressure water mist nozzles above main engine cylinder tops; verify automatic activation from flame detectors.
24/7 Port & Anchorage Attendance Across India
Seanav Marine provides rapid shore-based and offshore launch boat boarding across all 170+ Major and Minor Indian Ports, including:
Certified Equipment & Replacement Spares in Stock
Seanav Marine maintains bonded warehouse spare parts inventory across major Indian ports for immediate dispatch and installation during port calls:
Download Tanker Deck Foam & Water Mist System Checklist
Guidelines for taking foam samples, testing proportioners, and maintaining water mist systems.